The efficieny of the CYTOK® power-to-gas energy factories

1. February 2024

picture: © CYTOK GmbH

Our thematic week goes on with an example to show you the efficieny of our power-to-gas energy factories.

A CYTOK® energy factory based on 10 MW electrolysis can have an annual production of up to :

  • 1.500 tons of green hydrogen
  • 12.000 tons of green oxygen
  • 3.000 tons of green LNG
  • 32 GWh of usable process heat from electrolysis and methanation
  • 8.000 tons of green methanol

The energy factory scalability starts from 2 MW

Now you know: Our energy factories are all-rounders

EMMISSION-FREE SUSTAINABLE DECENTRALISED ECONOMICAL

You can find out more about our power-to-x technology via the following link: https://cytok.de/en/technology/

… and more about our solutions via the following link: https://cytok.de/en/solutions/

Your hydrogen pirates from the Baltic Sea/Germany

Follow us also on LinkedIn and Instagram:  

https://www.linkedin.com/company/cytok

https://www.instagram.com/cytok_powertogas/

Weitere Beiträge:

Japanese delegation from our partner GPSS visits our power-to-gas plant

Japanese delegation from our partner GPSS visits our power-to-gas plant

As part of the “Woche des Wasserstoffs 2024”, Tomofumi Ono (CEO of GPSS Engineering Inc.), Shohei Yoshimoto (Executive Director / Division Head of Transnational Business Division of GPSS Holdings Inc.) and Izabela Lopes (Director GPSS Group) visited our running power-to-gas plant at Bernsteinsee Hotel GmbH in Sassenburg.